SIZE:seamless pipe made DN 15-DN600 1/2"~24"
Welded pipe made DN15-DN1200 1/2"~48"
Pressure:SCH5S-SCH160
Standard:GB/T12459, GB/T13401,HG/T21635 ,HG/T21631


|
Product Name |
Stainless Steel Butt Weld 45 Degree Elbows |
|
Size |
11/2"-48" |
|
Seamless Pipe Made Dn 15-dn600 1/2"~24" Welded Pipe Made Dn15-dn1200 1/2"~48" |
|
|
Pressure |
Sch5s-sch160 |
|
Surface Threatment |
Polished,sand Blast |
|
Standard |
Gb/t12459, Gb/t13401,hg/t21635 ,hg/t21631 |
|
Main Products |
Elbow45.,90.,street Elbow,tee,cross,hex Nipple,red Socket M/f,plug,socket Banded,hex Cap,round Cap, |
|
Nut, Bushing,union, Coupling, Spe, Spu,hose Nipple, Welding Nipple, Barrel Nipple, Parrel Nipple |
|
|
Amr,auto Parts,sanitary Union,sanitary Fitting,sanitary Valve |
|
|
Sample Making |
Available, Free Sample With Freight Collect |
|
Package |
Plastic Bag,bubble Bag, Cartons, Wooden Pallet,wooden Box |
|
Custom |
Available, Customize As Your Design,photo,drawing |
|
Payment Terms |
30% Prepayment T/t,balance Against B/l; L/c. |
|
After-service |
Replacement for free if there is any quality problem |
|
Lead time |
Usually no more than 30 days, according to your quantity |
WIN-VIET culture:
The company's business philosophy is "not to be big but to be strong".
The goal of the company is to obtain the right to participate in the international industry standards, right to speak and right to formulate.
Business philosophy: pragmatic,persistent and innovative;
Business aim: to build a world-class century-old enterprise;
Core values and enterprise spirit: sincerity;
Management policy: practical and down to earth,professional and enterprising,pioneering and innovative,responsibility supreme;
Slogan:With the spirit of sincerity,innovation,responsibility,and the policy of practical and down to earth,professional and enterprising,pioneering and innovative, responsibility supreme.
Product requirements are strict:
Internal:test raw material of stainless steel and wax;
repair WAX ,if the wax mold is unqualified, the cluster process will not be assembled.\4
Before pouring, spectrum analysis will be carried out
After passivation, the first casting inspection will be carried out. If it is unqualified, it will be returned for treatment.
We have three inspection teams when processing CNC lathes, namely, workers' self inspection, patrol inspection and final inspection before leaving the factory. Even, some products will be leak tested.
Due to so carefully to quality,we win more and more returned customers.
External:Passed ISO,BV, PED,AD2000,UKCA,accept any 3rd party inspection before shipment.
FAQ:
Q: How long is your delivery time?
A: Generally it is 10 days if the goods are in stock. or it is 100 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A:Free sample with freight collected.
Q: What is your terms of payment ?
A: 30% T/T in advance ,balance against B/L or L/C at sight.
Q:Are units that failed inspection clearly marked and separated to prevent accidental dispatch?
A:Yes, the units are separated and marked clearly
Hot Tags: stainless steel butt weld 45 degree elbows, manufacturers, suppliers, factory, wholesale, Vietnam, for sale, free sample, Stainless Steel Butt Weld Cross, Vietnam Stainless Steel Butt Weld Concentric Reducer, Stainless Steel Butt Weld Caps, Stainless Steel Butt Weld Equal Tees, Vietnam Stainless Steel Butt Weld Equal Tees, Vietnam Stainless Steel Pipe Fittings 150lbs

